Stoodmark日本語
Rhaetian Railway in the Albula / Bernina Landscapes
Photo: “GlacierLandwasser” by Champer / CC BY-SA 3.0 / Wikimedia Commons · Cropped

Rhaetian Railway in the Albula / Bernina Landscapes

WHC 1276Inscribed 200846.41°N 10.02°E27 Wikipedia languages

The number of Wikipedia languages with an article is our measure of how widely known a site is. How many people have stood at a site or want to go will be shown once enough people use the app.

Record this in the app

Seals, your want-to-go list and the year you stood here are kept in the iPhone app.

Timeline
3000 BCEFrom 1898Today

How it came to be

Until about 1890 south-eastern Switzerland had almost no railways, and the spa of St. Moritz was a 14-hour stagecoach ride from Chur. On 30 June 1898 the Federal Assembly decided to build the Albula line, and work began the same year.

Between Bergun and Preda the valley rises more than 400 m within 5 km as the crow flies. The project supervisor Friedrich Hennings wound the track like the thread of a screw through spiral tunnels and over bridges, adding 12 km to keep the gradient within 3.5 percent. The Albula line reached St. Moritz in 1904, about 67 km with 42 tunnels and galleries and 144 viaducts and bridges.

The Bernina line was built to serve hydroelectric plants on the south side of the pass and to bring in tourists, and opened throughout from St. Moritz to Tirano in Italy on 5 July 1910. It was electric from the start and climbs gradients of up to 7 percent without a rack. In 2008 the two lines and their landscapes were inscribed as a property shared by Switzerland and Italy.

Data: Wikidata (CC0). Photos: Wikimedia Commons, under each photo’s license. Prototype; may contain errors. We measure usage anonymously to improve the app (PostHog, EU).