Stoodmark日本語

Pontcysyllte Aqueduct and Canal

WHC 1303Inscribed 200952.97°N 3.09°W42 Wikipedia languages

The number of Wikipedia languages with an article is our measure of how widely known a site is. Counts of visitors and wishes will appear once enough people use the app.

Record this in the app

Seals, want-to-go and the year you stood here are recorded in the iPhone app.

On the timeline
3000 BCEFrom 1795Today

How it came to be

The Pontcysyllte Aqueduct was planned as a key link in the Ellesmere Canal, meant to join the Severn at Shrewsbury with the Mersey at Liverpool. The first stone was laid on 25 July 1795. Thomas Telford designed it, and William Jessop, the more experienced canal engineer, oversaw the work.

The canal runs 39 metres above the river in a trough of cast-iron plates bolted together, carried on slender masonry piers. It is 307 metres long with 19 spans. The ironwork came from the Shrewsbury ironfounder William Hazledine, who built a foundry nearby in the hope of winning the contract and cast the trough there.

The aqueduct opened on 26 November 1805 and cost about £47,000. The expected revenue never came and the canal was only partly finished. The site takes in 18 km of canal built without locks. It was inscribed on 27 June 2009.

Data: Wikidata (CC0). Photos: Wikimedia Commons, under each photo’s license. Prototype; may contain errors. We measure usage anonymously to improve the app (PostHog, EU).